Questions and answers

Short answers for owners, managers and builders. For the law itself, with sources, see Florida requirements.

What is a BDA?

A bi-directional amplifier (BDA) is a signal booster built for public-safety radio. It picks up the fire and police radio signal through an antenna on the roof, amplifies it, and sends it through the building. It works in both directions, so a firefighter's radio inside can also reach the radio site outside.

BDA, DAS, ERRCS, ERCES: are these different things?

They are names for parts of the same system. The BDA is the amplifier. The DAS (distributed antenna system) is the network of antennas and cable or fiber that carries the signal to every floor. ERRCS (emergency responder radio coverage system) and ERCES (emergency responder communication enhancement system) are the names codes use for the whole thing.

Does my building need one?

In Florida, the local authority having jurisdiction (usually the fire marshal) sets the minimum radio signal strength for fire department communications, under section 633.202(18) of the Florida Statutes. A building that doesn't meet it inside may be required to install an enhancement system. The same law exempts some buildings, such as one- and two-family homes, townhouses, and buildings under 12,000 square feet with no underground areas. A signal survey tells you where your building stands.

Florida's deadlines for existing buildings have passed. What now?

The statute gave existing high-rise buildings, including high-rise apartment buildings, until January 1, 2024 to apply for a permit and until January 1, 2025 to comply. Both dates have passed. If your building isn't compliant, talk to your fire marshal about where you stand. Where a fire marshal requires an existing building to retrofit its system after those dates, the statute gives the owner at least 1 year from the notice of violation to finish.

Can a new building get a temporary certificate of occupancy without the system?

Under section 553.79(22) of the Florida Statutes, the authority having jurisdiction may not withhold a temporary certificate of occupancy based solely on the need for a two-way radio communication enhancement system. Once the design is approved, the system must be installed within 12 months after the temporary certificate of occupancy is issued.

How is coverage tested?

Each floor is divided into a grid, typically 20 roughly equal areas, and radio quality is checked at the center of each one. NFPA 1225 (2022 edition) measures quality as delivered audio quality (DAQ) and requires at least DAQ 3.0 in both directions. Critical areas such as exit stairs, fire command centers and fire pump rooms are held to a higher coverage percentage than the rest of the building. Your fire marshal sets the exact procedure.

How long does the backup power have to last?

NFPA 1225 (2022 edition) requires a secondary power source that can run the system at full capacity for 12 hours, for example a dedicated battery. Orange County Fire Rescue's checklist, written to NFPA 1221 (2019 edition), lists the same 12 hours. Your fire marshal confirms which edition applies.

How often does the system have to be tested?

NFPA 1225 (2022 edition) calls for a documented system test at acceptance and once every 12 months. Separately, Florida law lets the fire marshal require a fresh assessment of a building's radio coverage, but not more than once every 3 years for existing high-rises and existing buildings over 12,000 square feet, and once every 5 years for other existing buildings, unless something changes, such as a major renovation or a report that responders' radios failed inside.

Is the FCC involved?

Yes. The system amplifies frequencies licensed to a public-safety agency, so it needs that license holder's express consent, kept in a format that can be shown to the FCC. Florida law requires the same consent for any new system or change to an existing one. Broadband (Class B) signal boosters must also be registered in the FCC's signal booster database.

Will this fix cell phone coverage too?

Not on its own. A public-safety system is designed and approved for the fire department's radio channels. Cellular coverage is a separate system with its own carrier approvals. Tell us if you need both and we will plan for it.

Who pays for the system?

The building owner. The requirement applies to the building, so the system belongs with its other fire and life-safety equipment, like the fire alarm.

What do you need from me to start?

The property address, the building type, the number of floors or the square footage, and where you are in the process: new construction, an existing building, a failed inspection or an annual test that's due. Floor plans and any letters from the fire marshal help. Send what you have through the signal survey form.

For a question about your own building, send us the address and what's going on. Request a signal survey