Skip to content
Point 2 Point Communications
The rear of a fire engine and the side of a rescue truck at night, emergency lights on.

We install theradio system yourfire marshal wants

Firefighter radios often cut out in stairwells, garages and lower floors. Florida requires a fix, usually called an ERRCS or BDA system. We test the building, put the system in and are there when the fire marshal inspects it.

  • Florida
  • New and existing buildings
  • On site for the inspection

Where radios stop working

Concrete and steel block radio signal. When we test a building, these are the spots that usually fail.

Steel stair flights seen from below, stacked floor over floor.
Stairwells
A dim underground parking garage with concrete columns and a fire exit door.
Underground garages
A concrete column in a parking garage with a sign for level 5 and the stairs.
Garage stair towers
A firefighter in silhouette walks through a doorway filled with smoke.
Rooms and hallways deep inside

What we do

  1. Test the building. We walk every floor with a meter and mark where the signal drops.

  2. Draw it up and pull the permit. The fire marshal reviews the design before anything goes in.

  3. Install it. An antenna on the roof, the amplifier, antennas on each floor and the cable between them.

  4. Pass the inspection. We're there when the fire marshal tests it, and we come back for the test every year after.

What Florida law says

  • Existing high-rises had to apply for a permit by Jan 1, 2024 and comply by Jan 1, 2025. Both of those dates have passed.

    Fla. Stat. §633.202(18)(a)
  • New buildings have 12 months from the temporary certificate of occupancy to get the system in, once the design is approved.

    Fla. Stat. §553.79(22)
  • Once it passes, the system has to be tested and written up every year.

    NFPA 1225 (2022) §20.3.10

Your local fire marshal decides what passes. Read the Florida ERRCS requirements

Common questions

What is an ERRCS?

It stands for emergency responder radio coverage system. It gets fire and police radio signal into parts of a building it can't reach on its own. An antenna on the roof picks up the signal, an amplifier (the BDA) boosts it, and small antennas on each floor (the DAS) put it back out.

What does the fire marshal check at the acceptance test?

They try radios all through the building, area by area, and check them against their own pass criteria. Every fire marshal's office has its own checklist. We set up the system and the paperwork to match yours.

We're building new. When does the system need to be in?

Within 12 months of the temporary certificate of occupancy, once the design is approved. It's a lot easier to plan for it while the building is going up. §553.79(22)

The fire marshal sent a notice. How long do we have?

Florida law gives you at least a year from the date of the notice to finish the work. §633.202(18)(g)

How often does the system need testing?

Once a year after it passes, with the results written up. NFPA 1225 (2022) §20.3.10

Request a signal survey

Send us the address and tell us what's going on. We'll email you back.

This form isn't connected yet, so requests can't be sent from this page.